Field

Electromechanical project

Xiamen Lugong Electromechanical Engineering Co., Ltd.


Xiamen Lugong Electromechanical Engineering Co., Ltd. is located in Xiamen, a beautiful international garden city.


The group company has strong capital, and its holdings and affiliates have:

    Zhongjian Hongteng Construction Group Fujian Branch (special level)

    Zhejiang Kaida Decoration Engineering Co., Ltd.

    Xiamen Lugong Group Co., Ltd.

    Xiamen Lugong Medical Equipment Co., Ltd.

    Xiamen Baoshi Decoration Design Engineering Co., Ltd.

    Xiamen Jinxiada Engineering Equipment Co., Ltd.

    Xiamen Lugong Medical Technology Co., Ltd.

    Xiamen Lugong Electromechanical Engineering Co., Ltd.

    Quanzhou Lugong Medical Technology Co., Ltd.

    Xiamen Lugong Construction Labor Service Co., Ltd.


The company's main business scope:


I. Purification workshop engineering design and construction

 1 semiconductor, LCD electronic 100-level purification clean room project

 2 large and medium-sized precision electronics, medical, biological 1000-level purification clean room project

 3 large and medium-sized electronics factory, pharmaceutical factory 10,000 clean room engineering

 4 large and medium-sized LED photoelectric, food and beverage, cosmetics 100,000-level purification car-free workshop project

 5 large and medium-sized net, electronics, packaging, optical and magnetic industry 300,000 purification clean room project

 6 various test and purification installation projects

 

Second, the design and construction of central air conditioning installation engineering

 Various large and medium-sized high-rise buildings, office buildings, commercial plazas, hotels

1 air-cooled MRV variable capacity digital multi-unit central air conditioning project

2 water-cooled screw type, centrifugal chiller central air conditioning project

3 air-cooled screw type, scroll type chiller central air conditioning project

4 air-cooled mode central air conditioning project

5 water-cooled cabinet machine central air conditioning project

6 water source heat pump central air conditioning project

 

Third, the whole plant hydropower installation engineering design and construction

1 whole plant high and low voltage distribution project

2 whole plant switchgear, busway, cable, bridge construction project

3 whole plant freezing and cooling circulating water pipeline project

4 whole plant compressed air pipeline project

5 whole plant water supply and drainage, fire engineering

6 whole factory lighting, power engineering

7 whole plant ventilation cooling, smoke exhaust pipe project

8 whole plant fluid pipeline project general contracting


Fourth, pressure pipeline installation engineering design and construction

1 oxygen, natural gas, hydrogen pressure pipeline engineering

2 carbon dioxide, nitrogen, ethylene pressure pipeline engineering

3 heat transfer oil, steam, pressure pipeline engineering

4 petrochemical, fluid pipeline engineering

5 various stainless steel, seamless steel pipe engineering

6 various fire arresters, quick shut-off valves, oil-water separators, busbars, decompression distribution box installation


V. Design and construction of high and low voltage switchgear installation engineering

Electric survey and design, power installation engineering, power distribution equipment, power cables, transformer electrical complete sets of various types of new, capacity-increasing and temporary power consumption. Acting for electricity, testing, power supply procedures.

1ET1-12 central switchgear

224KV intelligent high pressure center cabinet

3SFC6 square fluorinated sulfur fully enclosed, fully insulated central cabinet HXGN17-12, HXGN15 high voltage network cabinet

4KYN28-24, KYN28-12 high voltage switchgear

5GCK, GCS, MNS-CT low voltage withdrawable switchgear

6GGD low-voltage flow distribution cabinet

7GGJ, JCJ-XL intelligent reactive power compensation cabinet

8CT-Gzow DC screen, XL-21, SMC anti-corrosion distribution box


9SC10-12 fully enclosed dry, oil immersed, side vertical transformer


Core competitiveness:


★Complete qualifications. After more than 20 years of development, Lugong Group has already possessed national special qualifications and a number of grade-level qualifications, such as: construction decoration and decoration engineering professional contractor level, construction electromechanical installation engineering professional contractor level, electronics and intelligence Chemical engineering professional contractor level, general construction contracting level 2, building curtain wall engineering professional contracting level, fire protection engineering engineering professional contracting level, medical equipment business license (1, 2, 3) and other dozens of qualifications .


★Professional technical service


1. New technology, new technology, super energy-saving, ultra-environmental research and development team to provide customers with modern engineering and technical services


2. Experienced large-scale purification, electromechanical, air conditioning, intelligent, environmental protection, decoration, fire protection design teams to provide customers with integrated solutions


3, more than 20 years of experience in various large-scale engineering construction management to provide customers with reliable quality assurance


4, module combined clean operating room research and development, production


★ Perfect team


1. The core leadership team, with more than 20 years of development, the company has created a group of professional core leadership teams.


2. Elite training classes and elite training courses are the talent selection development plans built by Lugong Group for the selection and training of talents.


3. Professional and technical personnel, with many professional design engineers and experienced technicians.


4. Independent and perfect after-sales service team, Lugong Group adheres to the service tenet of “Quality First, Customer Supreme”, and the company has introduced the current advanced management system.


5, module combined clean operating room research and development, integrated module combined clean operating room new construction mode has "industrial custom production, rapid assembly on site, variable space function, green environmental protection and energy saving, cost investment" and other characteristics, and domestic tradition Different modes of medical institution construction, the integrated modular clean operating room is an operating room that goes down the assembly line. This model leads the innovation of the latest technology in the medical clean industry.


★Quality of social resources, Lugong Group is committed to providing value-added services to our customers to the greatest extent, not forgetting social responsibility and mission, joining social welfare organizations and providing services to customers.


All rights reserved: LUGONG GROUP

胸部解放运动,国产的一级毛片最新在线直播,www国产久,9久久99久久久免费精品热播线